PARTIAL LIST OF WATER TREATMENT PROJECTS OF POWER PLANT

 

No.

Item

User

Control System

Status

Application

1

Chemicals Adding

Shiheng Power Plant

SPEC200

Starting 1987.6

Design,Integration,Programming,Test

2

Acid Adding of Circulating Water

Shiheng Power Plant

SPEC200

Starting 1987.6

Design,Integration,Programming,Test

3

Make-up Water

Pingwei Power Plant

MODICON 584M

Starting 1989.5

Programming,Test

4

Sampling of Water & Steam

Shiheng Power Plant

SPEC200

Starting 1989.5

Programming,Test

5

Waste Water

Huaneng  Shidongkou  Power Plant

A-B PLC 5/15

Starting1991.1

Test

6

Make-up Water

Huaneng  Shidongkou  Power Plant

A-B PLC 5/15

Starting 1991.1

Test

7

Water Pre-Treatment

Huaneng  Shidongkou  Power Plant

A-B PLC 5/15

Starting 1991.1

Test

8

Chemicals Adding

Huaneng  Shidongkou  Power Plant

A-B PLC 5/15

Starting 1991.1

Test

9

Chlorinf Adding of Circulating Water

Huaneng  Shidongkou  Power Plant

A-B PLC 5/15

Starting 1991.1

Test

10

Sampling of Water & Steam

Huaneng  Shidongkou  Power Plant

A-B PLC 5/15

1991.1

Test

11

Crude Water Treatment

Wujing  Power Plant

Mitsibishi D Series

1991.8

Design,Integration,Programming,Test

12

Acid Adding of Circulating Water

Huaneng  Shidongkou  Power Plant

A-B PLC 5/15

1991.12

Test

13

Anti-Infitration

Huaneng  Shidongkou  Power Plant

A-B PLC 5/15

1991.12

Test

14

Condensate

Wujing  Power Plant

MODICON 984-680

1992.4

Design,Integration,Programming,Test

15

Waste Water

Wujing  Power Plant

MODICON 984-680

1992.4

Design,Integration,Programming,Test

16

Make-up Water

Wujing  Power Plant

MODICON 984-680

1992.4

Design,Integration,Programming,Test

17

Make-up Water

Qishuyan Power Plant

Mitsbishi F Series

1992.7

Design,Integration,Programming,Test

18

Pure Waater Station

Jinshan Petrochemical Plant

MODICON 984-680

1992.11

Design,Integration,Programming,Test

19

Periodic Drain of  Boiler

 Nantong Cellulose Fibers Co.

TEXAS T1-545

Starting 1993.1

Design,Integration,Programming,Test

20

Make-up Water

 Nantong Cellulose Fibers Co.

TEXAS T1-545

Starting 1993.6

Design,Integration,Programming,Test

21

Air Cooling of Circulating  Water

Datong #2 Power Plant

A3ACPU

Starting 1993.6

Design,Integration,Programming,Test

22

Runback Control System

 Nantong Cellulose Fibers Co.

TEXAS T1-545

Starting 1994.9

Design,Integration,Programming,Test

23

Make-up Water

Waigaoqiao Power Plant

MODICON E984-685

Starting 1995.4

Design,Integration,Programming,Test

24

Condensate

Maanshan #2 Power Plant

MODICON E984-686

Starting 1995.12

Design,Integration,Programming,Test

25

Make-up Water

Mozafago Power Plant of Pakistan

MODICON E984-687

Starting 1996

Design,Integration,Programming,Test

26

Condensate

Mozafago Power Plant of Pakistan

MODICON E984-688

Starting 1996

Design,Integration,Programming,Test

27

Industrial Service Water

Ezhou Power Plant

OMRON C1000H

Starting 1996

Design,Integration,Programming,Test

28

Make-up Water

Power Station of Zhonhua Paper Mill

Siemens S-115U

Starting 1996

Design,Integration,Programming,Test

29

Industrial Waste Water

Ezhou Power Plant

sPEC200

Starting 1996.4

Design,Integration,Programming,Test

30

Make-up Water

Gas Turbine Unit of Huarui Power Plant

B&R 2005

Starting 1997

Design,Integration,Programming,Test

31

Pump Room of Circulating Water

Zhongshan Power Plant

COMPACK PC130

Starting 1997

Design,Integration,Programming,Test

32

Boiler  & Service Water

Shanghai Waigaoqiao Qiba

MODICON PC225

Starting 1997.1

Design,Integration,Programming,Test

33

Make-up Water

MALCD Power Plang of India

GE 90

Starting 1999.3

Design,Integration,Programming,Test

34

Dearator & Feedwater of Boile

Power Plant of Meishan MetallurgicalCo.

 

Starting 2000.3

Design,Integration,Test

35

Waste Water

Zhangzhou Houshi Powr Plant

AB PLC 5/40E

Starting 2000.3

Design,Integration,Programming,Test

36

Make-up Water

Wenzhou #2 Power Plant

MODICON QUANTUM

Starting 2000.4

Design,Integration,Programming,Test

37

Make-up Water

Nantong Cellulose Fibers Co.

TEXAS T1-545

Starting 2000

Design,Integration,Programming,Test

38

Waste Water & Circulating Water

Xutang Power Co.Ltd

 

Starting 2001

Integration

39

Periodic Drain of  Boiler

Huibei  #2 Power Plant

MODICON E984-385

Starting 2000.4

Design,Integration,Programming,Test

40

Make-up & Waste Water

Iraq Gas Turbine Unit

MODICON QUANTUM

Starting 2001.1

Design,Integration,Programming,Test

41

Make-up Water

Shangdong Zhangqiu Power Plant

MODICON QUANTUM

Starting 2002.2

Design,Integration,Programming,Test

42

Make-up Water

Shangdong Liyan Power Plant

MODICON QUANTUM

Starting 2003.3

Design,Integration,Programming,Test

43

Pump Room of Circulating Water

Jiaxing Power Plant

MODICON QUANTUM

Starting 2003.8

Design,Integration,Programming,Test

44

Condensate

Huangshi Power Plant

AB PLC 5/40E

Starting 2003

Design,Integration,Programming,Test

45

Centrialized Control of Water Zone

Jiawang Power Plant of Jiangsu Province

MODICON QUANTUM

Starting 2003

Design,Integration,Programming,Test